10 Year Achievement Award

After nearly two years of work, the new Energy World biomass boiler specialist training center – which was celebrating its 35th anniversary – was inaugurated in the suburbs of Salzburg, Austria.

Hargassner continue to dominate the sub 330kW biomass sector right across Europe and the UK with high quality reliable machines and this new Energy World Facility is testimony to their ongoing drive for perfection and commitment to the sector. We also picked up a 10 year achievement award for UK supplies of the machines. Well Done Mark and the team!!

The Energy World building at Hargassner has been extended to a surface area of ​​6,000 m². On the ground floor there are three training rooms or theoretical training rooms dedicated to installers of the brand. Two symmetrical training rooms are both sized for 25 people, but can be further enlarged by removing the movable intermediate wall. The third room designed for a dozen people is dedicated to small training sessions or large meetings.

On the ground floor, the practical training area of ​​850 m² has all the equipment of the brand (boilers, control desks, spare parts, etc.). A movie theater with less than 100 seats is used for training and guided tours, as well as for outdoor events. A room exhibition was also created and brings together the latest Hargassner innovations. An open-space administrative office will finally create 40 new workstations